Furniture Manufacturing Lead Times: Production versus Arrival
Arrival time is different from manufacturing lead time. A bedroom or salon order within Egypt differs from a quantity order for an overseas showroom because transport, installation and order reviews create separate stages.

Initial estimates by product type
According to Two Brothers, a bedroom takes around one month to 40 days, while a corner sofa, classic salon or sofa suite may take around three weeks. These manufacturing estimates vary by order type, quantity and specifications and are not one promise for every order.
Approvals affect the start date
Specify when lead time begins, such as after design, dimension and material approval and completion of agreed requirements. Colour, quantity or dimension changes after work starts can alter the schedule. Dealers should prioritise designs rather than give every piece the same required date.
Separate shipping and installation stages
Request separate dates for production completion, collection readiness, dispatch, arrival and any included installation. For overseas destinations, the carrier or specialist confirms route-specific transport details. Do not convert a production estimate into a showroom opening date without reviewing every stage.
Prepare your order
- Order approval date
- Manufacturing time for each group
- Readiness date
- Transport plan
- Installation, if included
Discuss your order with Two Brothers in Damietta
Two Brothers Furniture has operated since 1994. It uses dried timber and offers manufacturing in any quantity, with special dealer pricing according to the order. According to the factory, it holds ISO 9001 quality management and ISO 14001 environmental management certificates valid until 2027. Request updated copies to review the issuing body, certification scope and exact expiry date.
A lifetime warranty covers manufacturing defects. Delivery is available within Egypt and worldwide, with arrangements confirmed for each order and route. Price and schedule depend on design, materials and quantity. Manufacturing time is separate from shipping and delivery.
FAQs
Does three weeks include delivery?
No. The estimate refers to manufacturing. Shipping and delivery timing are discussed separately.
How do I agree on timing for a new showroom?
Share the opening date and priorities early, and request a written schedule covering production, transport and receiving.
Discuss dimensions and design and request a quotation
Send reference images, quantities, dimensions, materials, country, city and required date. We will discuss specifications, quantity, price, timing and included services without assuming one price or lead time applies to every order.
Discuss your design and request a quotation on WhatsApp · Address and contact details