Choosing furniture · Prepared by Two Brothers Furniture
Measuring Your Room Before Ordering a Damietta Bedroom
A suitable bedroom combines dimensions, circulation and storage. Before production, measure the room and access routes and draw doors and windows rather than relying on total floor area alone.

Start with the bed and circulation
Specify the bed dimensions and areas that need daily access. Allow practical movement space suited to the room and user rather than one universal figure. If you have a mattress, send its actual measurements and discuss compatibility with the frame.
Review wardrobe doors and drawers
Opening direction affects the layout. Show doors, windows, sockets, dressing table and bedside tables. Map circulation before approving the wardrobe: a piece that fits a wall may obstruct a doorway or passage in use.
Plan access and installation
Provide corridor, lift and stair dimensions and delivery floor. Discuss removable parts, installation and included services. The factory indicates bedroom production may take one month to 40 days according to details and quantity, with transport and installation added separately.
Prepare your order
- Room dimensions
- Mattress size
- Opening direction
- Electrical points
- Transport access
Discuss your order with Two Brothers in Damietta
Two Brothers Furniture has operated since 1994. It uses dried timber and offers manufacturing in any quantity, with special dealer pricing according to the order. According to the factory, it holds ISO 9001 quality management and ISO 14001 environmental management certificates valid until 2027. Request updated copies to review the issuing body, certification scope and exact expiry date.
A lifetime warranty covers manufacturing defects. Delivery is available within Egypt and worldwide, with arrangements confirmed for each order and route. Price and schedule depend on design, materials and quantity. Manufacturing time is separate from shipping and delivery.
FAQs
Is floor area alone enough?
No. Room shape, opening directions and door and window positions affect furniture layout as much as total area.
How long does bedroom manufacturing take?
The factory’s estimate is around one month to 40 days, confirmed for the order and quantity and excluding shipping.
Discuss dimensions and design and request a quotation
Send reference images, quantities, dimensions, materials, country, city and required date. We will discuss specifications, quantity, price, timing and included services without assuming one price or lead time applies to every order.
Discuss your design and request a quotation on WhatsApp · Address and contact details